Consulting

Feasibility study for a renovation and development, concept in Alexandria, Egypt

Feasibility study for a renovation and development, concept in Alexandria, Egypt

 

The city of Alexandria intends to implement fundamental modernisation and expansion of its existing tram network and tram fleet in the coming years. This requires extensive consulting performance for the APTA. The experience of Leipziger Verkehrsbetriebe (LVB) GmbH may also be referred to in this

Description of project:

  • Track renovation and construction in sections, including all junctions on the Ramleh line
  • Conversion of the track systems on the Medina line, Ras-El-Tin section (partially as green track)
  • Renovation of entire track network on the Medina line
  • Line expansions (construction of new tramways)
  • Trams

Overall project value:
-

Dates (start/end):
2006-2008

Name of client:
APTA Alexandria Passenger Transport Authoritty

Type of Services provided:

  • Technical, operational and economic feasibility study
  • Maintenance planning for existing tramways and infrastructure facilities
  • Development of modern maintenance strategies
  • Assessment of proposed new tramways
  • Training management

Intermodal Transport and Control System Chemnitz, Germany

Intermodal Transport and Control System Chemnitz, Germany

 

Description of project:

The project is handled together with Weisskopf Engineering AG.

  • Establishment of a computer-assisted operational control system with private digital telecommunication network
  • Equipping of vehicles with on-board computers and radio communications equipment
  • Integration of the technology in the traffic control centre
  • Integration of the combined communication system of the public transport association
  • Integration of Autobus Sachsen GmbH

Overall project value:
190.000 EUR

Name of client:
Chemnitzer Verkehrs AG

Dates (start/end):
2008-2010

Type of Services provided:

  • Consulting
  • Co-operation on drafting of specifications
  • Project management
  • Construction supervision